Quickbooky

Accounting News

Time Tracking

QuickBooks Time Project Report: Where It Lives and How Filters Behave

QuickBooks Time's project report appears under two names and its filters hide quirks; here is how users find it, run it, and get the output they need.

COMMUNITY ISSUESQUICKBOOKY

QuickBooks Time teams that need hours broken out by project or customer keep running into the same snag. The report they want exists, but it answers to two names, sits behind a plan gate, and carries filters with quirks of its own. The accepted guidance, published by Intuit for QuickBooks Time, addresses all three, and it is where we start.

Two names for the same report

The report Intuit documents is the total hours detailed report. It shows the tracked hours for each project or customer and lists the team members who worked on each one. Some accounts display it under a different label, a detailed hours worked total, which is the first thing that trips a menu search.

Classic QuickBooks Time adds a wrinkle. Its reports menu lists a detailed hours total and a project report as separate entries, so users on the older interface can find both names side by side. The numbers behind them are the same; the doors are not.

Where do you run it?

In the current interface, open the apps area, choose Time, then Time reports, and pick the total hours detailed report. Set the filters and run it. The route runs through the Time app itself, which may explain why users hunting elsewhere come up empty.

Classic Time keeps its own path. Open Reports there and choose either the detailed hours total or the project report. The filtering works the same way in both interfaces.

Which plans include it?

The report is not universal. Intuit ties it to its paid QuickBooks Online tiers, Plus and Advanced among them, and to the Premium and Elite payroll plans. Accountant-firm accounts are covered too. Plan lineups have shifted before, so treat any list as a snapshot rather than a promise.

If the option is missing from your menus, check the subscription level first. A tier without this level of time tracking will not show the report, no matter where you look.

Filter behavior worth knowing

The team member filter includes everyone by default. Type a name to narrow it, or open the list and select people. The trap: a typed name overrides anything chosen under groups and team members. The typed entry wins, and the group picks are ignored.

The project and customer filter also starts wide, with every project code and customer included. Choosing All beside that filter opens a list with three views. One shows only the projects or customers assigned to you. Another shows active items, and only admins and managers see that option. The third shows everything, active and archived alike, assigned or not.

Custom fields follow the same pattern when they appear. Fields such as billable status, service items, or class become filters, and you select the items each one should include. Nothing needs configuring; the fields show up when the account uses them.

Filters can also arrive after the run. Click a slice of the pie chart to drill into that segment. Clear the additions with the clear-all option, or remove one at a time with the x beside it.

Timesheets, downloads, and printing

The report is only half the workflow. The same guidance covers the timesheets behind the totals, and that is where the paper trail starts. Open the timesheets to check individual entries against the report. Download them when payroll or a client invoice needs the raw records. For payroll, the downloaded timesheets carry the entries while the report carries the summary, and most teams want both.

Printing closes the loop. The finished report can go to paper for approvals and files, and a printout reflects the filters exactly as they stand. Settle the filters first, verify the totals against the timesheets, then download or print. A downloaded copy also keeps the data once the on-screen filters move on. That order saves a second run.

The short version

The confusion around this report is mostly naming and navigation. Open the Time app, go to its reports, and look for a detailed hours total rather than anything labeled project. Check the plan if the report is absent. Let the filters narrow the run, and the hours per project, with the people behind them, follow from there.

← Back to Community Issues