Projects in QuickBooks Time Elite: the setup path splits in two
Projects in QuickBooks Time Elite track hours against estimates. The accepted setup path depends on whether the account is linked to QuickBooks Online.
If you have gone looking for instructions on setting up projects in QuickBooks, you have probably landed on a page written about QuickBooks Time Elite. That mismatch explains most of the frustration. The steps are correct, but they are conditional, and the condition is easy to skim past. Projects behave differently depending on whether the account you are working in is linked to QuickBooks Online.
One record, two possible starting points
When the account is connected to QuickBooks Online or QuickBooks Online Payroll, the project has to exist in QuickBooks before QuickBooks Time can see it. From there you open the QuickBooks menu in QuickBooks Time, choose Import, and then choose Projects. The start and end dates travel across with the record. An estimate does not travel with it, so it is added on the QuickBooks Time side once the project has arrived.
If the account is not connected, the direction reverses. In QuickBooks Time you open Projects, choose the option to add a project, and work through a short form. A project name is required. Everything else is optional: the customer the work is for, a start date and an end date, a description, and a location entered as an address or as map coordinates.
Attaching a customer is worth doing deliberately. The project then appears in that customer’s list, marked as a project so it is not confused with the customer’s other entries. Leaving the optional fields blank does no harm, and the details can be filled in later through the edit steps.
The estimate is where your choice gets locked in
An estimate gives a project something to measure against, and the accepted answer treats it as optional rather than mandatory. You add it from inside the project, and you pick one of two forms. By hours means a single total: every timesheet entry recorded against the project counts toward that figure. By tasks means the same overall total, divided into named items, so hours used appear against each part of the job. Either way the total is the sum of tracked time, and the difference is only in how progress is displayed.
One detail catches teams out. The choice between hours and tasks is fixed once the estimate is saved, and it cannot be changed afterwards. Decide which shape you want before you save, not after the first timesheet lands against the project.
Task items are created and managed from inside the project itself. The same field also shows up among custom fields, which is why some teams find project items in a second place they did not expect. That is expected behaviour. It does not mean the items are being duplicated or that something has broken.
Edits follow the side that owns the record
For a connected account, the edit belongs in QuickBooks. Make the change there, then import again so QuickBooks Time picks it up. The accepted answer is explicit about that order, and following it keeps the two records aligned.
Without that link, the edit happens in QuickBooks Time itself. Open Projects, find the record, open the more options menu, choose Edit, make the change, and save. Estimates have their own entry in that same menu, so hours and task items can be adjusted without touching the project details.
Hours, permissions, and the closing steps
To whoever is logging time, a project looks like any other customer or sub-customer. The normal time entry routine therefore applies, and no separate process is needed to record hours against it.
The accepted answer also lists managing projects, viewing project details, completing a project, cancelling a project, deleting a project, and managing project permissions. Three of those deserve care. Completing, cancelling and deleting are presented as separate actions, and the answer does not say what happens to time already tracked against the project in each case. Settle that question before closing out a job rather than discovering the answer afterwards.
Project details are where the estimate and the hours recorded against it belong together, so that view is the one to check when a project looks further along, or less far along, than you expected.
Permissions sit apart from the project. If a colleague cannot see an option the instructions describe, the permission setting is the first thing to check, not the project itself.
Read the instructions for your setup, not the other one
None of this makes the published steps wrong. It makes them conditional. A project either starts life in QuickBooks Time or arrives by import from QuickBooks Online, and estimates are added in QuickBooks Time in both cases. Editing then follows whichever side holds the record.
That single rule clears up nearly every mismatch between the instructions and what you see on screen. If a menu option is missing, check which setup you are actually running before assuming the feature has gone.