Quickbooky

Accounting News

Time Tracking

Managing shifts in QuickBooks Time Web: the full workflow

QuickBooks Time Web lets you build, assign, and publish work shifts, but drafts, colors, and repeat limits trip users up. Here is the workflow that works.

COMMUNITY ISSUESQUICKBOOKY

Teams that run hourly schedules keep hitting the same wall in QuickBooks Time Web. A shift gets built, looks right on the calendar, and still never reaches the crew. The cause is usually the draft stage. Shifts stay white and invisible to staff until someone publishes them, and the publish step is easy to skip.

Plans that include shift scheduling

Shift scheduling in Time Web is not universal. It is available on QuickBooks Online Standard, Plus, Advanced, and Accountant, and on subscriptions that carry Online Payroll Premium or Elite. Users on other plans will not see the schedule tools described here. If the Schedule option is missing, the plan is the first thing to check.

Finding the schedule

The schedule sits one menu deep. In QuickBooks Online, open All apps, select Time, then choose Schedule. If you are already in QuickBooks Time, Schedule appears in the main navigation on its own. Both routes land on the same calendar.

Creating a shift

Two entry points exist. Click inside any empty calendar cell, or open the Actions menu and choose to add a shift. Either one opens the shift editor.

Most fields in that editor are optional. Only three are required: a start date, plus start and end times, which also carry a time zone. Everything else refines the shift:

  • All day, for shifts without fixed hours.
  • Repeat, with limits covered below.
  • Title and color, which control how the shift reads on the calendar.
  • Team members.
  • Project or client, required only if you want people to clock in against the shift in the companion mobile app.
  • Location, which fills in with suggested places from Google Maps as you type.
  • Notes, plus any custom fields you have added.

Leave the team field empty and the shift still saves. It parks in the Unassigned row along the top of the calendar until someone claims it.

Drafts look white, published shifts take color

The editor ends with a choice, and it is the one that matters. Save as draft keeps the shift out of everyone’s calendar; it shows white on yours. Publish pushes it onto the calendars of the assigned team members and their managers, and it takes on the color you picked. White means unseen. Color means live.

Repeating shifts have hard limits

The repeat option asks for a frequency and an end. End it on a date and the schedule runs at most one year out. End it after a number of occurrences and the ceiling is 365 shifts. Plan long rosters around both caps, because the editor will not go past either one.

Adding people to an existing shift

Open the schedule, click the shift, and choose Edit in the window that appears. Type a name into the team members field and pick the match from the list. Save afterward as a draft or publish it straight away. Assigning a person does not publish the shift for you.

Publishing several shifts at once

Drafts pile up fast when you build a week in pieces. Select the drafts you want to release and use the publish action; every selected shift lands on the team’s calendars at once and takes its color. Nothing goes out to anyone until you take that step.

After publishing: print, revert, edit, delete

A published shift is not locked. You can return it to draft, which pulls it back off the team’s calendars and returns it to the white, unseen state. Reverting is the safe route when a week’s plan changes before the work starts.

Need a printed copy for a break-room wall? The schedule view offers a print option that produces a copy of the schedule you have on screen.

Editing follows the same path as assigning: click the shift, choose Edit, change what needs changing, then save or publish again. Deletion also lives in the shift window. Deleting removes the shift from the calendar entirely, drafts and published shifts alike, so edit is the better choice when only the hours moved.

The short version

Build the shift, fill in the date and times, attach the people, and press Publish. White is a warning, color is a confirmation, and repeat plans stop at a year or 365 occurrences. Get those habits right and the schedule behaves.

← Back to Community Issues